South Rotunda – Final Outfit Stage Commissioned

Malin Group News

Malin Group is excited to announce that the final stage of the re-development of the South Rotunda has been commissioned. Constructed in 1890, the South Rotunda, along with an identical building on the North side of the river, was built as an entrance to a vehicular and passenger tunnel under the river Clyde. The tunnel closed to the public in 1980.